- 15:00-17:00
- NTU@one-north campus
Industry Dialogue (Hybrid): SS 558 Code of practice for construction, installation, operation and maintenance of intruder alarm systems – Requirements for CAMS (Clause 12)
The hybrid Industry Dialogue session will provide key updates, departures, and revisions from SS 558:2010, in particularly on Clause 12 – Requirements for CAMS.
| Key areas for discussion: Clause | Description |
|---|---|
| 12.1 | Location and construction with 2-hour fire resistance |
| 12.2.1 | portable fire extinguishers |
| 12.2.2 | tested and logged monthly |
| 12.2.3 | CAMS protection |
| 12.3 | Additional requirements for the security protection of CAMS |
| 12.4.1 | Alarm receiving equipment |
| 12.5.2 | Standby power supply |
| 12.7 | Requirements for staff |
| 12.8.3 | Alarm response |
| 12.8.4 | Audio and video recording |
| 12.9 | Connection to the Singapore Police Force |
Industry Dialogue Session Highlights
- Proposed amendments to SS 558:2010
- Highlight and share with local industry on reasons for change in SS 558:2010
- Hear from the local industry on concerns of the changes
- Addressing concerns from local industry before proceeding to Public CommentIEC 62477 (Safety requirements for power electronic converter systems and equipment)
Who should attend?
- Users of the SS 558 standard include Central Alarm Monitoring Station (CAMS) Operators, Security Service Providers (SSP) who are specialists in intruder alarm system trades, design consultants, specialist contractors, testing, inspection and certification (TIC) companies and relevant government agencies and regulators..